Munich RE

This full floor interior build-out was all about sharp, clean lines, with a flexible, functional design to make it both appealing and hard-working. The large conference room features a custom-made modern folding wall, that when fully extended transforms the space into two smaller but still generously-sized rooms that can be used at the same time for separate events. There are also plenty of offices, breakout rooms, and smaller conference rooms where the work gets done. When it’s time to take a break, employees gather in a bright, comfortable, open pantry with booth and table seating where they can eat, meet, and socialize.

Highlights
Location:
437 Madison Avenue, 26th Floor
Square Footage: 10,000
Architect: Roy Gee Associates / AECOM
VP of Operations: Robert Kondracki
Project Manager: Chris Kaczor
Superintendent: John (JR) Rauchut
Account Executive: Christopher Gallin

Back to All Work  |  Back to Timeline

  • Before-Munich RE One
    After-Munich RE One
    Before Munich RE One After

  • Before-Munich RE Two
    After-Munich RE Two
    Before Munich RE Two After

  • Before-Munich RE Three
    After-Munich RE Three
    Before Munich RE Three After